Dholera Smart City is rapidly emerging as one of India’s most forward-looking and strategically important development zones. Among the many mega-projects rising across the Dholera Special Investment Region (Dholera SIR), none has drawn as much national and global attention as the Dholera Global Airport, officially known as the Dholera Greenfield Global Airport (DSIR).
As we enter 2025, construction activities have accelerated, multiple milestones have been achieved, and DSIR is positioning itself as a major aviation hub—not only for Gujarat, but for India’s broader ambitions in manufacturing, exports, and advanced technology.
This comprehensive 2025 update covers construction progress, official approvals, industrial links, economic impact, and the expected commissioning timeline.
1. Why Dholera Needs a World-Class Airport
Dholera is India’s largest greenfield smart city, developed under the Delhi–Mumbai Industrial Corridor (DMIC). With massive investments pouring into sectors such as:
- Chip manufacturing
- Electronics and advanced industries
- Defense and aerospace
- Renewable energy
- Logistics and warehousing
…the region requires a major airport to support passenger travel, international cargo, and global business movement.
Ahmedabad Airport is already nearing saturation, making Dholera—with its vast open land and industrial vision—the ideal location for Gujarat’s next major aviation gateway.
2. Construction Status Report (2025): Major Milestones
The year 2025 marks a critical phase for DSIR as many elements of Phase 1 construction move into advanced stages.

✔ Runway Work 100% Complete
The primary 4 km runway is nearing completion and is designed to handle large aircraft, including:
- Boeing 747
- Boeing 777
- Airbus A350
- Airbus A380
This prepares for long-haul international operations from day one.
✔ Terminal Building Shell Completed
Interior work includes:
- Flooring
- Electrical and mechanical systems
- Lighting
- Passenger movement infrastructure
✔ ATC Tower Nearing Completion
Scheduled equipment installation: mid-2025.
✔ Apron, Taxiway & Cargo Zone Development
Groundwork for apron and taxiways is nearly complete. A cargo district is under development to boost Dholera’s industrial exports.
✔ Boundary, Utilities & Road Network Ready
Internal roads, drainage, water supply, electricity, and boundary works are almost fully
3. Policy Push & Government Announcements (2025)
Several new directives have been issued to accelerate the progress:
- Additional Financial Allocation
- Logistics & Aviation Park Approved – Attracting maintenance, cargo, and aerospace companies.
- Semiconductor Export Support – DSIR will handle temperature-controlled chip exports.
- Green Energy Integration – Solar infrastructure across the facility.
4. Strategic Advantages in 2025
✔ Massive Land Availability – 1,426 hectares.
✔ Excellent Connectivity
- 0 km from Dholera SIR
- 90 km from Ahmedabad
- 80 km from Bhavnagar
The Ahmedabad–Dholera Expressway will cut travel time to 45 minutes.
✔ Future International Hub
DSIR is planned to eventually surpass Ahmedabad Airport in passenger capacity.
5. Connectivity Enhancements in 2025
- Ahmedabad–Dholera Expressway Progress
Large sections open for testing; full completion expected by early 2026. - High-Speed Metro Proposal Revived
Ensuring future seamless connectivity. - Dholera SIR Internal Roads Fully Functioning
10-lane smart roads with underground utilities are operational.
6. How DSIR Will Boost Dholera’s Industrial Growth
✔ Semiconductor & Electronics
Tata’s chip fab will rely on DSIR for:
- Importing equipment
- Exporting chips
- Handling controlled cargo
✔ Aerospace & Defense
Aerospace clusters will depend on DSIR for testing and global operations.
✔ Renewable Energy Manufacturing
Solar and wind companies gain logistic support.
✔ Export-Led Manufacturing
By 2035, Dholera will become Gujarat’s top export hub — with DSIR as the core driver.
7. Expected Opening Timeline (2025 Forecast)
- Phase 1 Completion: Mid-2026
- Testing & Trials: Late 2026
- Commercial Operations Begin: Early 2027
Earlier freight operations possible if industrial demand increases.
8. Economic Impact Forecast (2025–2030)
DSIR is expected to generate major regional benefits:
✔ 300,000+ Jobs (direct and indirect)
✔ Strong industrial investment from global markets
✔ Rising property values around Dholera SIR
✔ Strengthened international presence for Gujarat
9. Quick Summary
- India’s premier greenfield airport under rapid construction
- 4 km A380-ready runway
- Terminal structure completed
- Integrated cargo & semiconductor logistics
- Expressway accelerating development
- Operations expected from 2027
- Long-term capacity of 50 million passengers per year
DSIR will not only serve Dholera—it will reshape Gujarat’s aviation and industrial landscape.
10. DSIR Will Transform India’s Aviation Future
2025 marks a pivotal point for the Dholera Global Airport. With rapid construction, strong policy support, and a maturing industrial ecosystem, DSIR is on track to become one of India’s most significant aviation assets.










